Project specification
Switchable smart glass for new-build and fit-out projects
Laminated PDLC units made to your glazing schedule, switching from clear to private in 100 milliseconds.
- 100ms
- Switching timeClear to private
- 87%
- Light transmissionPowered state
- 99%
- UV filteredAcross both states
- 10 W/m²
- Power drawSteady state
How it behaves
Specify clear and private states in one panel
With power applied, the liquid crystals align and the panel reads as ordinary clear glazing. Remove power and they scatter, returning a soft, even opacity that still carries daylight into the space. There is no mechanism, no track and nothing to gather dust.
Because the private state is the unpowered state, the glass fails safe to opaque. Where a clear fail state is required for escape routes or sightlines, we specify a small UPS on the drive circuit.
State
Clear
Powered · 87% light transmission
Live demonstration
Cycling automatically — press to take control.
Applications
Plan privacy into partitions, doors and observation panels
Units are manufactured to the approved schedule, so the glass suits the opening rather than the opening suiting the glass.
- Frameless and framed internal partitions
- Meeting rooms, boardrooms and executive suites
- Consulting rooms and ward observation panels
- Secure interview and teller rooms
- Rooflights, atria and internal courtyards
- Doors, screens and shopfront glazing
Procured as one coordinated package
- Glass build-up agreed against your glazing schedule
- Busbar and lead-out positions set to suit frame details
- Drive electronics, wall plates and control interfaces
- Setting-out drawings and electrical schematics for coordination
- Delivery sequenced with the glazing or fit-out programme
- Commissioning, O&M documentation and warranty registration
Specification
Performance data for project schedules
Glass build-ups, acoustic ratings and panel sizes are confirmed against your drawings. Full data sheets and control schematics are issued with the specification.
- Technology
- Laminated PDLC interlayer
- Switching time
- Approx. 100 ms at room temperature
- Visible light transmission
- Approx. 87%
- Viewing angle
- Approx. 130°
- Haze
- Approx. 5% ON / 80% OFF
- UV filtering
- Approx. 99%
- Life expectancy
- More than 10 years
- Unpowered state
- Frosted (opaque)
- Maximum width
- 2,000 mm
- Maximum height
- 3,000 mm
- Warranty
- Laminated glass 5 years, electronics 1 year
Control
Coordinate controls before installation
A remote control is included with every installation. A manual wall switch, motion sensor, app control and voice control are available as options, confirmed for your project before commissioning.
Panels may be connected in parallel up to a total area of 50 m² per single power-control system, subject to the project design and supplied equipment. The transformer should be installed in an accessible location, with a 240 VAC, 50/60 Hz fused socket provided nearby.
We provide the electrical schematic at specification stage so the M&E contractor can allow for containment, fused spurs and control cabling in good time.
Questions
Smart glass specification questions
The switchable film is laminated between two pieces of glass, normally 4–6 mm toughened glass on each side, with EVA film either side of the PDLC layer.
Each panel has a discreet lead-out from a busbar along one edge. We agree the edge and exit position with you at specification stage so the cable is concealed within the frame, head detail or floor channel.
Shaped, raked and curved panels are possible. Send the setting-out drawing with your enquiry and we will confirm feasibility and the busbar arrangement before manufacture.
Always switch the glass OFF before cleaning and do not switch it back ON until the surface is completely dry. Use only a damp, clean, lint-free microfibre cloth, avoid chemicals and excessive water, and do not allow water to enter the glass edges.
Sectors
Project experience across six sectors
Next step
Submit your drawings for specification and budget costing.
Glazing schedules, elevations or a simple room list are enough to begin. Budget costs are typically issued within two working days.
