IntegriGlaze

Residential

High-specification privacy glazing for residential projects

In high-specification homes the brief is usually the same: keep the glazing clean and uninterrupted, and find privacy somewhere other than a blind.

Sectors/Residential
100ms
Switching timeApprox., either direction
10 W/m²
Power drawHeld clear only
2 years
Retrofit smart filmWarranty period
5 years
Sealed glass unitsWarranty period
Residential glazing

The brief

Sector specification and performance brief

Bathrooms and en-suites are the most frequent use: clear glass while the room is in daylight, private at the touch of a switch, with no obscure pattern to live with permanently.

Garden rooms and glazed links behave differently after dark, when the glazing becomes a mirror to the outside. A switchable panel closes that sightline instantly.

Applications

Project applications and panel schedules

Typical positions on residential projects. Send a room list or glazing schedule and we will mark up the panels that suit switchable glazing.

  • Bathrooms and en-suites without obscure glass
  • Garden rooms, glazed links and orangeries screened after dark
  • Bedroom and dressing room partitions
  • Home offices and studios within open-plan interiors
  • Apartment glazing overlooked by neighbouring buildings
  • UV film protecting art, joinery and furnishings from fading

Considerations

Procurement constraints and site coordination

These points usually decide between laminated switchable glass, retrofit film and UV film on a given elevation.

  • Power supply and switch positions agreed with the electrician
  • Frame detailing and how lead-outs are concealed
  • Access, protection and working in a finished home
  • Wet areas and the cleaning products used in them
  • Control choice - remote, wall switch, sensor, app or voice

Products

Recommended routes for this project type

Full performance figures, sizes and warranty terms are on each product page.

Next step

Submit your drawings for specification and budget costing.

Glazing schedules, elevations or a simple room list are enough to begin. Budget costs are typically issued within two working days.