IntegriGlaze

Retail & banking

Secure screening and UV protection for retail projects

Retail and banking interiors ask glazing to switch between welcome and discretion - and to keep the window display from fading while it does.

Sectors/Retail & banking
99%
UV filteredProtects display stock
1,800 × 3,000
Max film size (mm)Retrofit smart film
Approx. 130°
Viewing anglePowered state
In situ
Retrofit applicationNo glass replacement
Retail & banking glazing

The brief

Sector specification and performance brief

Interview and teller rooms need privacy on demand without becoming solid boxes on the floor plan. Switchable glazing keeps the space visually open until the moment it should not be.

Shopfront glass is a separate problem: ultraviolet light fades stock, packaging and print. UV film filters it while keeping the display bright.

Applications

Project applications and panel schedules

Typical positions on retail & banking projects. Send a room list or glazing schedule and we will mark up the panels that suit switchable glazing.

  • Interview, advice and teller rooms screened at a touch
  • Secure areas separated without solid walls
  • Window displays and stock protected from UV damage
  • Product launch and demonstration spaces
  • Back-office and cash-handling sightlines controlled
  • Shopfront glazing kept clear without heavy tint

Considerations

Procurement constraints and site coordination

These points usually decide between laminated switchable glass, retrofit film and UV film on a given elevation.

  • Security requirements and laminated build-up
  • Trading hours and night-shift installation
  • Brand standards for frame, edge and control detailing
  • Power availability at the partition head
  • Maintenance access for drive electronics

Products

Recommended routes for this project type

Full performance figures, sizes and warranty terms are on each product page.

Next step

Submit your drawings for specification and budget costing.

Glazing schedules, elevations or a simple room list are enough to begin. Budget costs are typically issued within two working days.