Hospitality
Flexible privacy glazing for hospitality projects
Hospitality glazing is a theatrical device as much as a practical one. A dining room that opens to the restaurant at lunch and closes for a private party at eight is one panel, switched.
- 100ms
- Switching timeApprox., either direction
- Remote
- Supplied as standardSwitch, sensor, app optional
- 5 years
- Laminated glassWarranty period
- 99%
- UV filteredProtects furnishings
The brief
Sector specification and performance brief
Guest-facing glazing is looked at closely. A switchable panel keeps a clean detail - no headbox, no pelmet, no cords - and gives the operator a room that can be reconfigured in an evening.
Suite bathrooms are the most common request: clear while the room is empty, private at a touch, with the control beside the bed or the door.
Applications
Project applications and panel schedules
Typical positions on hospitality projects. Send a room list or glazing schedule and we will mark up the panels that suit switchable glazing.
- Private dining rooms and function spaces
- Suite and en-suite bathroom glazing
- Spa treatment rooms and relaxation areas
- Bar and kitchen theatre screened between services
- Reception, concierge and back-of-house sightlines
- UV film protecting furnishings and artwork from fading
Considerations
Procurement constraints and site coordination
These points usually decide between laminated switchable glass, retrofit film and UV film on a given elevation.
- Housekeeping and cleaning routines around the panel
- Control placement that a guest can understand instantly
- Installation phased around occupancy and trading hours
- Humidity and cleaning products in wet areas
- Acoustic separation for private dining
Products
Recommended routes for this project type
Full performance figures, sizes and warranty terms are on each product page.
Related sectors
Related commercial glazing applications
Next step
Submit your drawings for specification and budget costing.
Glazing schedules, elevations or a simple room list are enough to begin. Budget costs are typically issued within two working days.
