IntegriGlaze

Healthcare

Clinical observation glazing for healthcare projects

Clinical glazing is judged on two things: whether staff can see in when they must, and whether the surface can be cleaned properly. Switchable glass answers both without a blind.

Sectors/Healthcare
Private
Unpowered stateFrosted on power loss
99%
UV filteredAcross both states
10 W/m²
Power drawUnder 0.5 W/ft²
Sealed
Wipe-clean surfaceNo blind cavity
Healthcare glazing

The brief

Sector specification and performance brief

A switchable panel is a sealed glass surface. There is no fabric, no slat and no cord, so there is nothing inside the partition line to trap dust or be taken out of service for cleaning.

Cleaning follows the sequence in our maintenance guidance: switch the system off, clean, and do not switch it back on until the panel is completely dry.

Applications

Project applications and panel schedules

Typical positions on healthcare projects. Send a room list or glazing schedule and we will mark up the panels that suit switchable glazing.

  • Ward and recovery observation panels
  • Consulting, treatment and examination rooms
  • Mental health and de-escalation spaces with controlled sightlines
  • Imaging and procedure room viewing panels
  • Reception and records areas requiring confidentiality
  • UV film on windows protecting stored stock and medication

Considerations

Procurement constraints and site coordination

These points usually decide between laminated switchable glass, retrofit film and UV film on a given elevation.

  • Infection control and the agreed cleaning regime
  • Fail state on loss of power — panels are private when unpowered
  • Observation requirements written into the room data sheets
  • Working in live clinical areas with restricted access
  • Documentation and warranty records issued at handover

Products

Recommended routes for this project type

Full performance figures, sizes and warranty terms are on each product page.

Next step

Submit your drawings for specification and budget costing.

Glazing schedules, elevations or a simple room list are enough to begin. Budget costs are typically issued within two working days.