Office
Workplace privacy specified for commercial fit-outs
Workplace glazing has to do two jobs at once: keep the floor plate open and daylit, and give a room genuine privacy the moment a conversation needs it.
- 100ms
- Clear to privateApprox. at room temperature
- 87%
- Light transmissionApprox., powered
- 2,000 × 3,000
- Max panel size (mm)Laminated glass
- 50 m²
- Per control systemPanels in parallel
The brief
Sector specification and performance brief
Blinds in a glazed meeting room fail slowly: slats bend, cords are removed on safety grounds, and within a year the room reads as tired. Switchable glazing removes the mechanism altogether.
On refurbishment floors where the partitions are staying, retrofit smart film gives the same result without taking the glass out or losing the floor to a glazing programme.
Applications
Project applications and panel schedules
Typical positions on office projects. Send a room list or glazing schedule and we will mark up the panels that suit switchable glazing.
- Board and meeting rooms screened on demand
- Executive offices and HR interview rooms
- Open-plan partitions with no blinds or manifestation
- Video-conference rooms where background sightlines matter
- Reception screens and visitor waiting areas
- Switching triggered by a wall plate, remote or occupancy sensor
Considerations
Procurement constraints and site coordination
These points usually decide between laminated switchable glass, retrofit film and UV film on a given elevation.
- Cable routes and power positions agreed with the M&E package
- Acoustic performance across the partition line
- Fire strategy and required sightlines to escape routes
- Phased or out-of-hours working on occupied floors
- Interface with the partition or glazing subcontractor
Products
Recommended routes for this project type
Full performance figures, sizes and warranty terms are on each product page.
Related sectors
Related commercial glazing applications
Next step
Submit your drawings for specification and budget costing.
Glazing schedules, elevations or a simple room list are enough to begin. Budget costs are typically issued within two working days.
